







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Rancho Palos Verdes: Scope, Timeline, and Cost
A full kitchen remodeling in Rancho Palos Verdes typically runs $14,000 to $45,000 and takes six to ten weeks of active construction once permits clear. The job means gutting the room to the studs and rebuilding it: new cabinets, counters, backsplash, flooring, lighting, plumbing fixtures, and appliances, with the layout reworked if you want it. On this city’s hillside lots, expect the permit timeline to stretch further than the construction itself. Call (888) 345-8164 to schedule a free on-site estimate and a written line-item scope.
How a Full Kitchen Remodel Comes Together, Stage by Stage

We don’t hand you a calendar and disappear. Here’s the sequence we run, what happens when, and what you’ll need to decide before each stage starts.
1. Design and material selection (weeks 1 – 3)
We measure the room, check what’s behind the walls where we can see it, and confirm whether the layout stays put or moves. You’ll pick cabinet door style and finish, counter material, backsplash tile, flooring, and fixtures during this window. For this market we commonly spec KraftMaid cabinetry with Cambria quartz, a Blanco sink, and a Delta or American Standard faucet. Decide all of it now, not during demo; late selections are the number one cause of a stalled kitchen.
2. Permits and engineering review (weeks 2 – 6, overlaps design)
We pull the permits and, on Rancho Palos Verdes hillside properties, coordinate whatever geotechnical or drainage review the city requires before the permit moves. You sign the permit application and approve any engineering cost. This is the stage that surprises out-of-town contractors.
3. Demo and rough-in (days 1 – 7)
Day one is protection, dust control, and tear-out. By day three the room is down to studs and subfloor. Then plumbing and electrical rough-in, any structural work for a moved wall, and the first inspection. You decide nothing here unless demo uncovers a surprise, and we stop and show you before we touch it.
4. Drywall, floors, cabinets (days 8 – 30)
Insulation, drywall, patch and prime, then floor installation, then cabinet set. Template for counters happens once cabinets are level and fixed; fabrication typically takes 7 – 14 days, which is your window for appliance delivery. You confirm the counter template on site.
5. Counters, tile, trim, final inspection (days 31 – 50)
Counter install, backsplash, finish plumbing and electrical, appliance hookup, paint and trim, then the final inspection. We walk the room with you, punch-list in hand. Every project is covered by our 730-Day Done Right Promise; if something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Be Choosing Between
- Cabinet boxes: stock, semi-custom, or custom. Stock is fastest and cheapest but limits sizes and fills. Semi-custom, like most KraftMaid lines, gives you real size flexibility and finishes at a mid price. Full custom costs the most and suits odd geometry in older homes.
- Counters: quartz, granite, or butcher block. Quartz is the durable, low-maintenance default and reads clean. Granite brings natural variation but needs sealing. Butcher block is warm and inexpensive but wants maintenance.
- Sink and faucet. An undermount Blanco or similar stainless or composite sink pairs with a pull-down Delta faucet for daily use. Farmhouse sinks look great and cost more to fit into the cabinet run.
- Layout: keep or move. Keeping the sink, range, and fridge in place saves plumbing and electrical money. Moving any of them adds rough-in cost and inspection scope; moving a wall adds structural work.
- Ventilation and lighting. A ducted hood venting outside beats recirculating for real cooking. Under-cabinet LED and recessed cans are the standard layer; pendants over an island are the character layer.
- Flooring. Luxury vinyl plank handles moisture and kids well at a lower price. Porcelain tile is the most durable. Engineered hardwood is the premium look and wants care around the sink.
What Full Kitchen Remodeling Costs in Rancho Palos Verdes, CA

Full kitchen remodeling in Rancho Palos Verdes runs $14,000 to $45,000, with most projects landing in the $24,000 – $34,000 range. The spread comes down to five variables:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full project total | $14,000 – $45,000 |
What pushes the number up: square footage, the condition behind the walls, relocating plumbing or electrical, moving structure, and material grade. A hillside home that needs a drainage correction or foundation work adds cost the flat-lot house down the street won’t see. What’s in a written estimate: labor, materials you select, permits, disposal, and a fixed price with no change orders unless you approve them. What typically isn’t: engineering reports, unexpected structural repair, and appliance purchase if you’re sourcing your own. The number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Rancho Palos Verdes Homes Specifically Do to This Job
Most of the kitchens we remodel in Rancho Palos Verdes sit in custom homes built between the 1950s and 1990s on large lots, and a kitchen gut often turns up what the original build left behind. On the hillside streets and terraced lots around Portuguese Bend, we regularly find older drainage and slab issues tied to the slope, and the marine air that rolls in with seasonal fog has quietly aged exterior walls, vents, and any exterior door near the kitchen. Wet winters and dry Santa Ana wind events stress the same envelope. The city’s geological review is part of the deal here: projects near landslide-prone zones may need geotechnical reports and City geologist sign-off before permits move. Inside, expect dated electrical, undersized venting, and the occasional surprise subfloor. If you’re considering the Kitchen Remodeling in Rancho Palos Verdes project as the bigger picture, our full-scope approach keeps the whole job under one contractor, from foundation to finish line. Homeowners often pair this with Full Bathroom Remodeling in Rancho Palos Verdes while the kitchen is open. We cover all of Rancho Palos Verdes, from the ridge tops down to the coastal streets.
Serving Rancho Palos Verdes, CA – Our Local Coverage Area
We serve Rancho Palos Verdes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Kitchen Remodeling in Rancho Palos Verdes

Full kitchen remodeling in Rancho Palos Verdes takes six to ten weeks of construction, plus two to six weeks of design and permit time before the first wall comes down. Hillside properties with geological review can add to the front end. Call (888) 345-8164 for a realistic timeline based on your lot.
Yes. Any full kitchen remodel that touches plumbing, electrical, gas, or structure requires permits in Rancho Palos Verdes, and hillside properties may also need geotechnical review. We pull the permits and manage the inspections so nothing stalls. Call (888) 345-8164 to discuss your project.
Yes, and most of our clients do. Keeping the sink, range, and fridge in place saves thousands in rough-in and inspection scope. Moving a wall or relocating plumbing adds cost and time but is entirely doable; we’ll give you a written line-item range for both options.
Full kitchen remodeling in Rancho Palos Verdes runs $14,000 to $45,000, with most projects landing in the $24,000 – $34,000 range depending on size, materials, and whether you move plumbing or structure. Call (888) 345-8164 for an exact written quote; estimates are free.
Every full kitchen remodel is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If something isn’t right, we come back and make it right, in writing. Call (888) 345-8164 to schedule your free estimate.
Ready to Price Your Rancho Palos Verdes Kitchen?
We’ll walk your kitchen, measure the room, check what’s visible behind the walls, and give you a written line-item estimate at no cost. On the call you’ll get a realistic timeline, a fixed price with no change orders, and answers about permits, drainage, or anything else the lot raises. Call (888) 345-8164 to schedule your free on-site estimate, or ask us a question first and we’ll answer it straight.
Written by the team at Groundwork Construction Co.












