Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Lomita: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Lomita typically run $14,000 to $45,000 for a full kitchen’s worth of both, and a typical job runs three to five weeks from demolition to final countertop install. The variables that drive the number are simple: how many linear feet of cabinet you’re replacing, whether the layout moves, and what material you put on top. We give written line-item estimates so you see the cabinet box cost and counter cost separately. Call (888) 345-8164 and we’ll walk you through it.
How We Run a Cabinet and Countertop Job in Lomita, Stage by Stage

Cabinet and countertop work has a fixed order of operations, and most of the frustration homeowners describe comes from a crew that skips or compresses a step. Here’s what ours actually looks like.
Stage 1: Measure and finalize the layout (visit one, 60 – 90 minutes)
We template the existing kitchen, note the appliance positions, and measure to the wall, not to the cabinet face. In older Lomita bungalows the walls are rarely plumb, so out-of-square corners get flagged now rather than discovered when a base cabinet won’t sit flush. You decide here: keep the current layout or move the sink, range, or fridge. Moving any of those three adds plumbing or electrical rough-in and pushes the job toward the high end.
Stage 2: Demo and rough-in (days 1 – 2)
Old cabinets, counter, and backsplash come out. If the layout changed, the plumber and electrician rough in the new sink supply/drain and the range and fridge circuits, and the wall behind the old backsplash gets patched and leveled. You’ll see a stripped room by end of day one. This is also when we check what’s behind the drywall, which in 1920s – 1950s housing stock often means a surprise: galvanized supply lines or a wall that needs furring out before cabinets hang straight.
Stage 3: Cabinet install (days 3 – 5)
Base and wall cabinets get set, shimmed, and leveled to each other, not just to the floor. Crown, fillers, and panels go on last so the run reads as one unit. You decide the door style and finish at ordering, so this stage is mostly execution, but you’ll want to plan where you want drawers versus doors before cabinets ship, since changing after the fact means reordering.
Stage 4: Countertop template and fabrication (days 6 – 14, mostly waiting)
Stone and quartz countertops are templated only after the cabinets are set, because the template follows the actual installed cabinet run. Fabrication and edge polish take roughly a week to ten days from template. Laminate and butcher block are cut to measurement and often go in faster. This is the quiet stretch where the kitchen sits unusable, so plan meals around it.
Stage 5: Countertop set, sink, and final plumbing (days 15 – 18)
Countertop gets set, the sink and faucet go in, and the final plumbing connection and electrical trim-out happen. Then we walk the room with you: drawer alignment, door reveal gaps, and caulk lines at the wall and backsplash. Anything that doesn’t sit right, we note and correct before we call the job done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Cabinet and Countertop Options You’ll Actually Choose Between
Two decisions drive most of the cost and most of the long-term satisfaction: cabinet construction type and countertop material. Here’s the honest trade-off on each.
- Stock cabinets: the fastest and least expensive route, available in fixed sizes you fill a run with using filler strips. Fine for a rental or a tight budget, but the door choices are limited and the finish won’t match a custom look.
- Semi-custom cabinets (KraftMaid range): what most Lomita homeowners land on. Standard boxes, but you pick door style, finish, and interior organization, and sizes come in 3-inch increments so gaps shrink. Mid-range cost, meaningfully better fit than stock.
- Full custom: built to the space, ideal for the odd nooks in older bungalows, but the longest lead time and the highest cost. Worth it if the kitchen is genuinely irregular.
- Quartz countertops: the default now. Non-porous, doesn’t need sealing, holds up to daily kitchen use, and comes in consistent slabs. Mid to high cost, and heat resistance is limited, so trivets matter.
- Granite: natural stone, each slab unique, and it tolerates heat better than quartz. It’s porous, so it needs resealing periodically, and slab variation means what you see at the yard is what you get.
- Butcher block or laminate: the budget-conscious picks. Laminate is the least expensive surface that still looks clean, though edges and seams show wear faster. Butcher block is warm and forgiving but needs oiling and shows knife marks.
Homeowners often pair this with Walk-In Showers & Shower Remodeling in Lomita when they’re updating the kitchen and a bath in the same pass, since sharing a crew window cuts disruption. If a second bath is on the list, the Tub-to-Shower Conversion in Lomita is the other job we get asked about most in the same breath.
What Cabinets & Countertops Costs in Lomita, CA

Plan on $14,000 to $45,000 for a full cabinet and countertop job in Lomita. The line-item ranges below are what we quote, kept consistent across every job we run here.
| Scope | Typical range |
|---|---|
| Cabinet installation (full kitchen) | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (passing item, own page) | $800 – $2,500 |
| Small kitchen cabinet and counter refresh | $9,000 – $20,000 |
Five variables push a job from the low end to the high end:
- Linear feet of cabinet: a galley kitchen at 10 feet is a different job than a U-shape at 22 feet. Cabinet cost scales with run length, not room size.
- Layout moves: relocating the sink, range, or fridge means plumbing and electrical rough-in, which adds days and dollars.
- Material grade: stock versus semi-custom, laminate versus quartz. The material choice alone can swing the total by several thousand dollars.
- Existing condition: unlevel walls, galvanized plumbing, or outdated wiring behind the cabinets all get corrected before new cabinets go in.
- Permit scope: a same-layout swap usually doesn’t need one; moving plumbing, electrical, or structure does.
A written estimate from us lists cabinets, countertop material and fabrication, labor, removal and disposal, permits where required, and the rough-in allowances. What it typically doesn’t include unless you ask: appliance costs (though we’ll note the cutout dimensions in the estimate), and changes you make after cabinets are ordered. Upfront pricing means the number you see is the number you pay for the scope written. Call (888) 345-8164 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Lomita Homes Specifically Do to This Job
Lomita is a fully built-out Harbor Gateway city, roughly one square mile and incorporated in 1964, so almost nothing here is new construction. The housing stock is mostly 1920s – 1950s bungalows and early tract homes on 5,000 – 6,000 square foot lots, which means most of our cabinet and countertop work happens inside a gut remodel of an aging wood-frame home. In those houses we regularly find knob-and-tube wiring and galvanized supply lines behind the old cabinets, and both have to come up to code before new cabinets go in.
Permitting is a real local factor. Because Lomita runs its own small-city building department layered on top of LA County’s coastal-area rules, plan check and inspection timing is negotiated lot-by-lot in a way it isn’t in sprawling neighboring Torrance. A same-layout cabinet swap usually doesn’t trigger a permit; moving the sink, adding a circuit, or opening structure does, and that timing should be built into your schedule. The marine layer and salt air are the other Lomita-specific issue: damp morning fog and salt-laden air drive fast corrosion of hinges, drawer slides, and fasteners, so we spec corrosion-resistant hardware on these jobs where it matters. Call (888) 345-8164 to talk through your specific kitchen.
Serving Lomita, CA – Our Local Coverage Area
We serve Lomita and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Lomita

Three to five weeks from demo to final plumbing, with the longest single stretch being the roughly 7 – 10 day countertop fabrication wait. Stock or laminate jobs can finish closer to two weeks because there’s no template-and-fabricate lag. Call (888) 345-8164 for a timeline specific to your kitchen.
Usually not if you’re keeping the existing layout and simply replacing cabinets and counters in place. A permit is generally required when you move plumbing, add or relocate electrical, or change structure. We check the scope against City of Lomita requirements and pull what’s needed, so call (888) 345-8164 and we’ll tell you upfront.
Yes. A same-layout swap is the most common job we run in Lomita, and it keeps both cost and timeline down by skipping rough-in work. You keep the sink and range where they are and get new cabinet boxes, doors, and a new counter on top. Call (888) 345-8164 to schedule a free estimate.
Most full jobs land between $14,000 and $45,000, with cabinet installation at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 as the two line items. Layout changes, material grade, and existing wall condition move the number. Call (888) 345-8164 for an exact quote, free of charge.
Every job we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Manufacturer warranties on cabinets and stone apply on top of that. Call (888) 345-8164 to talk through coverage before you commit.
Get a Free Estimate on Cabinets & Countertops in Lomita
Tell us what’s in your kitchen now and what you want in its place. We’ll come out, measure to your actual walls, and hand you a written line-item estimate for cabinets and countertops with the material options priced out. Calls are answered by a live person, 24/7, so there’s no voicemail wait. Call (888) 345-8164 to schedule your free on-site estimate. If you’re rethinking the whole room while you’re at it, that’s part of a full Kitchen Remodeling in Lomita, and you can read more about our Kitchen Remodeling service or see all we do across Lomita.
Written by the team at Groundwork Construction Co.