Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Long Beach, CA: What the Job Costs and How Long It Takes
Vanities, tile and fixtures work in Long Beach typically runs $9,000 – $28,000 and takes 2 – 4 weeks of active construction, with tile setting and fixture trim as the two longest stages. If you’re swapping only the vanity and fixtures without moving plumbing, you can land closer to $3,000 – $8,000. Call (888) 345-8164 for a free on-site estimate.
How the Work Actually Sequences, Start to Finish

Vanities, tile & fixtures work is unforgiving about order. Get the sequence wrong and you’ll tear out good material. Here’s what a real job looks like on a Long Beach bathroom, from the first morning to the walkthrough.
Stage 1: Demo and rough inspection (days 1 – 3)
We pull the old vanity, toilet, fixtures and any tile coming out. Then we open the wall behind the vanity and inspect the supply and drain rough-in, because in older Long Beach bungalows that’s where surprises live. You’ll get a decision point here: if the drain is cast iron with scale or the supply lines are polybutylene, we show you photos and quote the replacement before the new tile goes on. No surprises after the fact.
Stage 2: Rough plumbing, electrical and backing (days 3 – 5)
If you’re moving the vanity, this is when. New drain stubs, shutoff valves, GFCI circuits for the vanity lighting, and the blocking that a floating vanity actually hangs from. You decide the vanity size and wall position now, because tile layout depends on it. This stage is also where a permit inspection typically lands if your scope requires one.
Stage 3: Prep, waterproofing and tile layout (days 5 – 7)
Wet-area substrate gets waterproofed, then we dry-lay the tile to confirm layout, grout joints and cut placement. You approve the layout before a single tile is set. It sounds fussy; it’s the difference between a floor centered nicely on the room and one with a sliver at the door.
Stage 4: Tile setting and cure (days 7 – 14)
Floor and wall tile goes down, then cures before any grout. Larger-format tile and mosaic both need time here. You decide grout color and sealer during this stretch; it’s the last decision you make before the room starts looking like a bathroom again.
Stage 5: Vanity set, fixture trim and punch (days 14 – 21)
Vanity set and leveled, top and faucet installed, lighting and accessories trimmed out, caulk and grout sealed. Then a walkthrough, and you sign off on a punch list. Most jobs run 3 – 4 weeks wall to wall; a vanity-and-fixture-only job can finish in a week.
If the tile and fixture choices are the first phase of a bigger scope, this work sits naturally inside Bathroom Remodeling in Long Beach, and we scope it as one project rather than handing you off. Our bathroom remodeling service handles the full room when that’s what you need.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
These are the real forks in the road on this job. Pick with the trade-off in front of you, not a showroom photo.
- Vanity construction: stock, semi-custom, or custom. Stock cabinets are the cheapest and fast to get; they rarely fit an old wall floor-to-ceiling. Semi-custom gets you the size and finish without custom pricing. Custom fits a wonky Long Beach wall exactly and costs the most per linear foot.
- Vanity top: quartz vs. porcelain vs. natural stone. Quartz is the workhorse: non-porous, no sealing, forgiving. Porcelain is the least expensive and stands up well. Marble and other natural stone look incredible and need sealing and gentler cleaners. Cambria quartz is a common pick for a Long Beach bathroom that gets daily use.
- Tile material: porcelain vs. ceramic vs. natural stone. Porcelain is dense, water-resistant and the safest pick for floors and wet walls. Ceramic is cheaper and fine for dry walls only. Stone is beautiful and needs sealing. Larger-format tile reduces grout lines but demands a flatter substrate.
- Fixture finish: brushed, matte black, or chrome. Brushed nickel and matte black hide water spotting better than polished chrome; chrome is the least expensive and easiest to match. In a house with coastal salt air, finish durability matters more than in an inland bathroom.
- Grout and sealer. Epoxy grout resists staining better than cementitious grout and costs more per square foot. It’s the upgrade that pays off in a shower; less critical on a dry vanity wall.
What Vanities, Tile & Fixtures Costs in Long Beach, CA

Our Long Beach range for vanities, tile & fixtures is $9,000 – $28,000 for a full room. Broken out, the major lines look like this:
- Vanity and top installation: $800 – $3,000
- Floor and wall tile: $2,000 – $9,000 depending on area and material
- Fixture trim (faucet, shower, lighting, accessories): $500 – $2,500
- Rough plumbing and electrical, if relocating: $800 – $4,000
- Waterproofing and substrate repair: $500 – $2,500
The variables that push a job from the low end toward $28,000 are straightforward: square footage of tile, whether we’re relocating the drain or vanity, whether the substrate is sound or water-damaged, and material grade. A cast-iron drain swap under an old floor can add real money. So can a permitted scope that needs an inspection.
Every Groundwork Construction Co. estimate is written line-item, upfront, and the number you see is the number you pay. We pull the permits where the scope requires them. Add $1,000 off any project over $10,000 and 0% financing for 18 months if it helps the budget.
See the difference
Before
After
Before
After
Before
AfterThe Long Beach Details That Shape This Job
Long Beach is a permitting stack, not a single permit. A Rose Park or Belmont Heights bungalow often sits in a Coastal Zone or a historic context, so the same small lot can trigger Coastal Commission review, historic-district design review and seismic retrofit rules at once. Interior tile and vanity work usually sidesteps the design-review layer, but if the scope touches structure or plumbing in a way that requires a permit, the review timeline stretches, and that’s a schedule reality inland homeowners in Compton or Lakewood rarely deal with.
Then there’s the housing stock. Pre-1933 and 1930s bungalows and Craftsman fourplexes routinely hide original knob-and-tube wiring and decades-old un-permitted additions behind the vanity wall. Our technicians have up to 12 years of experience and know to open that wall and look before they set tile. The salt air off the Port of Long Beach also eats exterior wood and fasteners, so we spec fasteners and finishes that hold up to corrosion. On east-side fourplexes and older bungalows, we regularly see moisture intrusion behind tile that started as a slow leak years earlier. If a roof or structural repair is in the cards alongside the bathroom, homeowners often pair this with Tile Roofing in Long Beach or Specialty Roofing in Long Beach.
Serving Long Beach, CA – Our Local Coverage Area
We serve Long Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Long Beach

A full room runs 2 – 4 weeks of construction, with tile setting and curing the longest stretch; a vanity-and-fixture swap finishes in about a week. Groundwork schedules with a written start date, and the 730-Day Done Right Promise covers the workmanship if anything needs correction. Call (888) 345-8164 to pin down your timeline.
It depends on scope. A straight vanity and fixture swap usually doesn’t need one; moving plumbing, electrical or structure typically does, and Long Beach building permits and inspections apply. We pull the permits where required and walk you through the inspection. Call (888) 345-8164 for a free estimate that clarifies your scope.
Yes, and that’s the cheaper path, often $3,000 – $8,000. Keeping the drain and vanity location intact avoids rough-plumbing and permit work. If a new layout is what you want, we quote the relocation as a line item so you see the difference before you commit. Call (888) 345-8164 for an exact number.
Full-room work runs $9,000 – $28,000; a vanity-and-fixture-only job lands in the $3,000 – $8,000 range depending on material grade. Tile square footage and drain condition are the biggest cost drivers. Call (888) 345-8164 for a written, no-hassle upfront estimate.
Every project is backed by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If the tile, waterproofing or fixture work isn’t right, we make it right. Our technicians arrive uniformed and background-checked. Call (888) 345-8164 to book a free estimate.
Get a Free Estimate on Vanities, Tile & Fixtures in Long Beach
Call (888) 345-8164 to schedule a free on-site estimate for vanities, tile & fixtures in Long Beach. A live person answers around the clock, and we’ll walk your room, talk through material options, and hand you a written line-item quote. Wherever you are across Long Beach and the surrounding area, you’ll know the number before work starts.