







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What Full Bathroom Remodeling in Gardena Actually Involves
Full Bathroom Remodeling in Gardena typically runs $9,000 to $28,000 and takes five to eight weeks from demo to final inspection. You’re gutting the room to the studs and rebuilding the wet wall, floor, waterproofing, tile, and fixtures as one system. Most of our Gardena projects land in the $14,000 to $19,000 range because the 1950s tract homes here hide plumbing and framing surprises. Call (888) 345-8164 and we’ll walk your bathroom and give you a written line-item number before anyone swings a hammer.
How a Full Gut Bathroom Goes Together, Stage by Stage

Day 1 – 3: Demo and discovery. We pull the toilet, vanity, tub or shower, tile, and drywall down to studs and subfloor. This is the honest part of the job. In Gardena’s post-WWII stucco homes on slab, we almost always find galvanized supply lines that are furred out with scale, or a drain that was never re-vented when a previous owner moved the toilet. You get photos and a written change order before we touch anything. No surprises means no surprises.
Day 3 – 6: Rough-in and inspection. The plumber re-pipes supply and drain, the electrician runs GFCI circuits and a dedicated exhaust fan line to code, and we reframe anything soft. Then the city inspector signs off on rough plumbing and electrical. You decide rough locations now: shower valve height, niche placement, outlet positions. Moving a drain across the slab adds $1,200 to $2,800 in cutting, re-piping, and patching.
Week 2 – 3: Waterproofing and tile. This is where cheap jobs fail. We build a sloped mortar bed, apply a bonded waterproof membrane over the whole shower and floor, and flood-test the pan before a single tile goes down. You pick tile layout, grout color, and trim profiles at the start of this stage. Curing time matters here: in Gardena’s marine-layer mornings, thinset and grout dry slower, so we don’t rush the next phase.
Week 3 – 4: Setting fixtures and finishes. Tile goes up, floors get laid, and we set the vanity, toilet, shower trim, and glass. You choose fixtures in week 2 so nothing sits on a truck. Kohler and Atlas are the workhorses most of our clients pick. A curbless shower or freestanding tub can add a week for framing and waterproofing complexity.
Week 5 – 8: Punch, inspect, and walkthrough. The final inspection, a moisture check, and a full walkthrough with you. We leave touch-up materials and the warranty paperwork. Most jobs are done inside eight weeks; small rooms finish closer to five.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make (and What They Cost You)
Most of the budget swings live in four decisions. Here’s the honest trade-off on each.
- Shower vs. tub. A curbless walk-in shower runs $4,500 to $12,000 and suits older homeowners better. A tub keeps resale appeal for families with young kids but eats floor space. Tub-to-shower conversions are the most common request in these small 1950s bathrooms.
- Tile grade. Porcelain ($4 – $9/sq ft) holds up to Gardena’s dry air and cleans easily. Natural stone ($12 – $25/sq ft) looks richer but needs sealing every year or two. Large-format tile speeds the install; small mosaic costs more in labor.
- Vanity and countertop. A stock vanity ($800 – $3,000) is fine in most setups. A custom vanity with a Cambria or quartz top costs more but fits the odd alcoves these old homes have. Measured wrong, a stock unit leaves dead space.
- Waterproofing system. A bonded sheet membrane or liquid-applied system is the difference between a $14,000 shower that lasts twenty years and a $9,000 one that leaks into the garage in three. We don’t cut this corner, and we put that in writing.
What Full Bathroom Remodeling Costs in Gardena, CA

Full Bathroom Remodeling in Gardena runs $9,000 to $28,000, with most of our projects settling between $14,000 and $19,000 for a standard 5-by-8 hall bath. The number is real and it’s written, not a guess.
- Room size and layout: A tight hall bath stays near the bottom. A larger primary bath pushes toward the top.
- Existing condition: Old galvanized plumbing, soft subfloor, or a slab crack can add $1,500 to $4,000. These are common in 1950s – 60s Gardena homes.
- Relocating plumbing or structure: Moving the toilet, shower valve, or a wall across the slab adds $1,200 to $3,500.
- Material grade: Stock vanity and porcelain tile vs. custom cabinetry and stone. This can swing the job $3,000 to $6,000.
- Permit scope: A straight replacement is lighter on permits; structural or plumbing relocation requires plan review and inspection.
A written estimate includes demo, haul-away, rough plumbing and electrical, waterproofing, tile, fixtures, and the final inspection. It typically excludes structural repair found mid-demo, custom cabinetry beyond stock lines, and any additional permits beyond the base scope. Every one of those is called out before we start, not after.
See the difference
Before
After
Before
After
Before
AfterWhat Gardena Homes Specifically Do to This Job
Most of the bathrooms we remodel in Gardena sit inside post-WWII 1950s and 60s single-story stucco tract homes on small lots, often with original slab foundations and galvanized or early copper plumbing still in the wall. That means a full remodel frequently uncovers two things: a soft subfloor where a previous leak sat, and supply lines that need full replacement, not just a patch. Hidden structural and utility upgrades push many projects toward the upper half of the range. The city’s plan-check process is strict, which affects scheduling: we don’t start demo until rough-in drawings are approved, so expect a permit turnaround before day one. Gardena’s mild marine-layer summers mean less rained-out time than other markets, but thinset and grout need extra cure time on those damp mornings. On the 90247 and 90249 blocks, we regularly see slab moisture and poor drainage around the bath perimeter, which we address before tile ever goes down.
Serving Gardena, CA – Our Local Coverage Area
We serve Gardena and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Gardena

Most full bathroom remodels in Gardena finish in five to eight weeks. The permit review before demo can add one to three weeks on the front end depending on scope. Call (888) 345-8164 for a timeline based on your actual room.
Yes, a full gut remodel almost always requires a permit in Gardena because it touches plumbing, electrical, and often structural. We pull the permit and manage the inspections so it’s documented and safe. Call (888) 345-8164 to talk through your scope.
Yes, a layout-preserving remodel is the most common approach and keeps the budget at the low end. You get new waterproofing, tile, and fixtures while keeping the wet wall where it is. Call (888) 345-8164 to see what’s possible without relocating anything.
Full Bathroom Remodeling in Gardena runs $9,000 to $28,000, with most projects around $14,000 to $19,000. Condition of existing plumbing, size, and material grade drive the number. Call (888) 345-8164 for an exact quote; estimates are free.
Every job is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing. Call (888) 345-8164 to review the details on your project.
Many homeowners in our Gardena service area pair a bathroom remodel with Roof Repair in Gardena or Roof Replacement & Installation in Gardena when venting or attic inspection comes up, and some fold the bathroom into a larger Bathroom Remodeling in Gardena plan. If you want to see the wider scope we handle, review our Bathroom Remodeling service page.
Ready to Price Your Full Bathroom Remodeling in Gardena?
Call (888) 345-8164 for a free on-site estimate. We’ll walk the room, photograph the plumbing and subfloor, and hand you a written line-item number with a fixed price and no change orders unless you approve them. A live person answers around the clock. We serve homeowners across Gardena and the surrounding South Bay, and we bring the 730-Day Done Right Promise to every full bathroom remodel we take on.
Written by the team at Groundwork Construction Co.












