







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Gardena, CA: What It Costs and How Long It Takes
Concrete Driveways & Concrete Work in Gardena typically runs $4,500 – $12,000 for a new pour, and most residential driveways are finished in three to five working days from demo to cure. A full replacement of an old slab lands closer to $5,000 – $14,000 once you add haul-off, base repair and a new apron. The number that matters most is your existing subgrade, because Gardena’s post-war slabs have usually moved. Call (888) 345-8164 for a free on-site estimate and a written line-item quote.
How a concrete driveway actually gets built, stage by stage

Concrete is not a fast trade, and anyone who tells you otherwise is skipping steps you’ll pay for later. Here’s the real sequence we follow on Gardena slabs.
Day 1: Layout, saw-cut and demolition
We mark the new driveway footprint against the property line and the garage apron, then saw-cut and break out the old concrete with a skid steer and jackhammer. A standard two-car Gardena driveway (roughly 400 – 500 square feet) takes six to nine hours to demolish and load out. You’ll decide where the haul-out truck stages, since many lots on the 90247 and 90249 blocks leave no room for a dumpster plus a truck at once.
Day 1 – 2: Subgrade and base
Once the old slab is gone, we expose the subgrade and grade it for drainage away from the garage and toward the street. We compact a 4-inch Class II base in two lifts. This is where we find the surprises: old roots, a buried footing, or the sandy expansive soil that’s common in parts of Gardena. You’ll approve any base repair before we pour.
Day 2: Forming and rebar
Wood or steel forms go up at the final grade and profile. We tie #3 or #4 rebar on a grid at 18 to 24 inches on center, set on chairs so it sits in the middle of the slab, not on the ground. You’ll confirm the expansion joint locations and where the driveway meets the garage floor, since that’s the most common call-back complaint when it’s done poorly.
Day 3: Pour, finish and control joints
Ready-mix arrives, usually a 4,000 psi mix at a 5-inch slab thickness for residential driveways (6 inches with heavier rebar if you park a truck or RV). We screed, float and finish, then cut control joints within 12 to 24 hours while the concrete is still green. Skipping the saw-cut is the number one cause of random cracking we see on Gardena slabs.
Day 4 – 7: Cure and seal
Concrete reaches most of its strength in the first seven days. We keep you off it for at least 48 to 72 hours for foot traffic and around seven days for vehicles depending on weather. A cure-and-seal coat goes on at the end, and we usually return to check the joint lines at the two-week mark.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The concrete options you’ll pick between
Every concrete driveway is a set of trade-offs. Here’s what actually matters in Gardena, and what each choice costs you in dollars and in upkeep.
- Standard broom finish: the default choice. It’s the least expensive option and gives good grip in the marine layer mist. Suits anyone who wants low fuss and a clean look.
- Exposed aggregate: the top 1/8 inch of cement paste is washed away to reveal the stone. It looks richer and hides tire marks better than broom finish. It costs more per square foot and traps a bit more dirt.
- Slab thickness: 4 inches works for cars. 5 inches is our standard for Gardena residential. 6 inches with a heavier rebar grid is for trucks, RVs or a heavy-work vehicle parked daily.
- Rebar vs. mesh: welded wire mesh is cheaper but sits wherever it lands. Rebar on chairs stays in the middle of the slab where it does its job. The price difference is small; the longevity difference is not.
- Color and integral pigment: a pigment added to the mix gives you a consistent color through the full depth of the slab, unlike a surface stain. Pairs well with the stucco tones on most Gardena homes.
- Joint pattern: saw-cut control joints in a simple grid, or decorative scoring that breaks the slab into larger panels. You’ll decide this before the pour, because joints can’t be added later.
If the driveway is part of a full exterior rebuild with new hardscape, walkways or a front-yard redesign, it usually makes sense to plan that as one job – see our Driveway & Pavers in Gardena page for the wider scope.
What Concrete Driveways & Concrete Work costs in Gardena, CA

Here’s the honest pricing for concrete driveways and related concrete work in Gardena, based on standard residential lot sizes and current material and labor rates in the South Bay.
| Item | Typical range |
|---|---|
| New concrete driveway (standard, ~400 – 500 sq ft) | $4,500 – $12,000 |
| Full driveway replacement (demo, haul-off, new slab) | $5,000 – $14,000 |
| Exposed aggregate upgrade | Adds roughly 15 – 25% to the base pour |
| Driveway sealing (existing slab) | $250 – $700 |
What moves a job to the low end versus the high end:
- Square footage: the biggest driver. A single-car approach at 250 sq ft sits near $4,500 – $6,500. A double-wide at 500 sq ft or more pushes toward $10,000 – $12,000.
- Existing slab condition and haul-off: a thick old slab with rebar, or one sitting on a buried footing, adds demo hours and dump fees.
- Base repair: soft or expansive subgrade may need over-excavation and import base, which is the most common cause of a mid-range job jumping to the high end.
- Drainage and grading: if the driveway needs a channel drain or regrading to move water away from a low garage door, that’s an add.
- Permit scope: a straight replacement on an existing footprint in Gardena typically doesn’t require a building permit, but grading, new curb cuts or work in the city right-of-way do. We confirm this at the estimate.
A written estimate from us covers demo, haul-off, base compaction, rebar, forms, the pour, saw-cut joints, curing and seal. It typically does not cover: relocating a gas meter, moving a sprinkler main, or utility work inside the property line, which is quoted separately once we see the trench. The number you see on the estimate is the number you pay – no change orders unless you add work.
See the difference
Before
After
Before
After
Before
AfterWhy Gardena is a different concrete job
The housing stock here tells you almost everything about what we find under the slab. Most of the single-story stucco tract homes in the 90247, 90248 and 90249 ZIPs were built in the 1950s and 1960s on small lots, often with original slabs that have been re-poured once already. When you demo one of those driveways, we routinely hit buried footings from old garage aprons, tree roots that have pushed the slab up, and the sandy, expansive soils that make base prep non-negotiable here. The marine layer keeps summer temperatures mild, which is actually kind on a fresh pour, but it also means exterior flatwork poured late in the day can cure slowly and stay soft longer than you’d expect. And because Gardena has its own building department with a reputation for strict plan-check, we always confirm whether a new curb cut, grading or storm-drain tie-in crosses into the right-of-way before we cut. The city’s older storm-drain easements running through many of these small lots are the reason we check utilities before we dig, every time.
When your project grows beyond the driveway – converting the detached garage or adding a unit out back – homeowners often pair this with our Garage Conversion ADU in Gardena or a New Detached ADU in Gardena, and the concrete pour is planned around the ADU footprint from day one.
Serving Gardena, CA – Our Local Coverage Area
We serve Gardena and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Concrete Driveways & Concrete Work in Gardena

Plan on three to five working days from demo to completed pour, plus 48 to 72 hours off the slab for foot traffic and about seven days before vehicles. A larger job with base repair can stretch to six working days.
A straight replacement on an existing footprint typically doesn’t need a building permit. New curb cuts, grading changes or work inside the right-of-way do, and Gardena’s plan-check process is thorough, so we confirm with the city before cutting. We pull permits and pass inspections on your behalf wherever they’re required.
Yes, in most cases. We form the new slab to meet the existing garage floor at the same height and pour around the plumbing stub-outs. Only when the slab needs to drop below a gas meter or a downspout drain do we bring those trades in, and we quote that separately once we see the trench.
Residential pours land between $4,500 and $12,000, with replacements running $5,000 to $14,000. Exposed aggregate or a 6-inch slab with heavier rebar pushes toward the top of that range. Call (888) 345-8164 for an exact quote – estimates are free and itemized.
Every concrete job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s backed in writing on every estimate.
Schedule your free concrete estimate in Gardena
Concrete done right starts with a site visit, not a phone quote. We’ll walk your driveway, check the subgrade, confirm permit requirements against the lot and hand you a written line-item estimate with no surprises. That applies across Gardena and the surrounding blocks, from the 90247 lots up through 90248. Call (888) 345-8164 to schedule your free estimate, or see the broader scope on our Driveway & Pavers service page.
Written by the team at Groundwork Construction Co..












