A Groundwork company - serving Long Beach, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Long Beach, CA

ADU Design & Permitting in Long Beach - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Long Beach
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Long Beach, CA: What It Takes to Get a Permit-Ready Unit

ADU design and permitting in Long Beach runs $45,000 – $130,000 depending on whether you’re converting existing space or building new, and the design-plus-permit phase alone typically takes 4 to 9 months from first sketch to issued permit. The work isn’t the build itself – it’s assembling a set of plans, site surveys, and code findings that clear Long Beach’s planning, coastal, and historic review in one cycle instead of three. Call (888) 345-8164 to start with a free estimate and design consult.

Call (888) 345-8164

How ADU Design & Permitting in Long Beach Actually Moves, Stage by Stage

A garage converted into a guest room and home office

Most homeowners assume the hard part is construction. In Long Beach the hard part is the paper, and it runs in a specific order. Here’s the sequence we work through, with the real durations.

Stage 1 – Site feasibility and zoning check (1 – 2 weeks)

We map your lot: setbacks, existing coverage, whether you sit in a single-family or a legal nonconforming multi-family zone, and how much square footage the lot can actually carry. This is where most dead-end ADU plans die before they start, because the owner was told a number that the site couldn’t support. You decide here whether you’re converting, attaching, or building detached – each has a different cost profile.

Stage 2 – Concept and schematic design (3 – 4 weeks)

Floor plan, elevation, and siting. You’re picking unit size, bedroom count, kitchen and bath layout, and entry orientation. On older bungalows the entry matters more than people expect, because you’re threading a new door and path through an existing driveway or side yard. We produce a plan set you can price and a set you can permit; they aren’t always identical, and you’ll choose how much to lock now.

Stage 3 – Structural and site engineering (2 – 4 weeks, runs alongside design)

Here’s where Long Beach reality bites. On pre-1933 and 1930s stock, the engineer often finds original framing that needs a shear upgrade before an ADU can tie into it. You decide whether to strengthen the existing structure now or design the ADU to be structurally independent.

Stage 4 – Permit submission and plan check (8 – 16 weeks typical)

Long Beach plan check is a review queue, and the number of review cycles depends on how clean the submission is. Coastal Zone parcels and historic-context properties get an extra review layer. We submit, respond to correction letters, and track each cycle. You decide who handles the minor plan revisions; we don’t hand you a rejection letter and disappear.

Stage 5 – Permit issuance and construction sequencing (1 – 2 weeks)

Once issued, we sequence inspections. You’ll see the inspection schedule before the first day of work, not after the first failed inspection.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Specification Choices You’ll Weigh

ADU design forces trade-offs that a main-house remodel doesn’t, because every square foot is budget. These are the decisions that move your $45,000 – $130,000 range most.

  • Detached vs. attached vs. conversion footprint. A conversion is the cheapest path but inherits every flaw in the existing structure. A detached unit prices higher but is designed clean.
  • Unit size. A 400-square-foot studio with a kitchenette and a 900-square-foot one-bedroom differ by roughly 30 – 50% in total cost once kitchen, bath, and utility runs scale up.
  • Kitchen and bath grade. Entry-level cabinetry and laminate tops hold up fine in a rental unit; a family unit finished to main-house standard costs 15 – 25% more. We carry brand names like KraftMaid and Cambria when the budget supports it.
  • Roofing and exterior cladding. The marine layer and salt air off the Port of Long Beach accelerate corrosion on fasteners and rot on exterior wood; we spec corrosion-resistant fasteners and quality shingles from Atlas or Tamko, and impact-rated windows from PGT where the exposure warrants it.
  • Utilities and site work. A detached unit often needs a new meter, a trench to the main, and a separate sewer or a grinder pump. That can add $8,000 – $20,000 to a $90,000 base before a wall goes up.
  • Accessibility and future-proofing. A zero-step entry, wider doors, and a curbless shower now cost a few thousand dollars; retrofitting later costs far more.

What ADU Design & Permitting Costs in Long Beach, CA

A framer checking new wall framing on a home addition

The design, engineering, and permitting portion typically runs $45,000 – $130,000 depending on scope, and most homeowners who go through it are ultimately budgeting toward a full unit (the ADU Construction line is $90,000 – $220,000, and the garage conversion route sits at $30,000 – $80,000). What pushes a design and permit job to the low vs. high end:

  • Site complexity. A flat lot with an obvious rear-yard pad sits at the low end. A tight lot with an existing nonconforming structure, a shared driveway, or a legal-nonconforming multi-family building is at the high end.
  • Coastal or historic review. Coastal Zone and historic-context properties add review layers that extend the timeline and the design cost.
  • Existing-condition discovery. Original knob-and-tube wiring and un-permitted additions built decades ago are common on the older bungalows and fourplexes, and they cost money to reconcile on the drawings.
  • Structural upgrade scope. Whether the ADU is designed independently or ties into upgraded existing framing.
  • Plan set completeness. A preliminary feasibility sketch is cheap; a permit-ready set with structural, title-24, and site utility drawings is not.

A written estimate from us is line-itemed and locked before work starts: Upfront pricing, no surprises. And because a surprising number of ADU projects turn into a full house plan and permit scope, we’re also the same contractor for Home Additions & ADU in Long Beach as part of a full project.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Long Beach Homes Specifically Do to ADU Design & Permitting

Long Beach is the collision of very old stock and very new regulation, and both land on your ADU plans. A Craftsman bungalow in Rose Park or a Spanish Colonial in Belmont Heights sits in a Coastal Zone and often a designated historic context, which means you may be designing to Coastal Commission review and historic-district design review on the same small lot – a permitting stack you don’t hit inland. On the east-side fourplexes we routinely find original knob-and-tube wiring and additions built decades ago without a permit, which means the drawings have to first reconcile what’s physically there before anything new can be submitted. Soft-story and seismic retrofit requirements for older multi-family buildings make structural upgrades a routine, code-driven line rather than an elective. The marine layer and salt air off the Port accelerate rot and corrosion on anything exterior we specify, while near-zero annual rainfall and Santa Ana wind events keep the design focus on foundations and drainage. It’s a different job than a Lakewood or Compton lot, and we design for it. We cover Long Beach and the surrounding cities, and our Home Additions & ADU team handles the design and build under one roof. Homeowners often pair this with Full Kitchen Remodeling in Long Beach or Cabinets & Countertops in Long Beach when they want the main house finished to the same standard as the new unit.

Serving Long Beach, CA – Our Local Coverage Area

We serve Long Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Design & Permitting in Long Beach

A new bay window with a cushioned seat

Get a Free Estimate for ADU Design & Permitting in Long Beach

Book a free on-site estimate and design consult for ADU Design & Permitting in Long Beach. We walk the lot with you, check the zoning and setback picture, and give you a line-itemed range so you know what the design and permit phase will actually cost. Calls are answered by a live person, 24/7, and we’ll put the plan together in writing before anything starts. Call (888) 345-8164 to get on the schedule.

Written by the team at Groundwork Construction Co. of Long Beach.

Why Long Beach Chooses Groundwork Construction Co. of Long Beach

We set the standard for ADU design & permitting in Long Beach.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Long Beach

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Long Beach Customers Say

Trusted by homeowners across Long Beach and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New architectural shingles with a clean valleyA new casement window over a kitchen sinkA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in shower

More services in Long Beach

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Long Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Long Beach team

A local vetted partner works across Long Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Long Beach?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Long Beach.

(888) 345-8164

Request a Free Estimate in Long Beach

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch